Greenfields Shopping Centre

Construction of a single-storey retail centre, delivered in two phases.

Commercial
GO BACK
Client
Terrace Africa Property Developers
Country
Zimbabwe
Completion
2026
Duration
24 Months

scope of work

Construction of a single-storey retail centre, delivered in two phases:

Phase 1
Construction of the retail centre, comprising an anchor store, line shops, a KFC drive-through, ablution facilities and associated site works. Total build area: 8,937m².

Phase 2
Construction of the retail centre, comprising an anchor store, line shops, a Steers drive-through, ablution facilities and associated site works. Total build area: 2,167m².

Anchor store:
A large-format tenant space designed for major retail operations.

Line shops:
Smaller retail units for multiple tenants.

Drive-through outlets:
Purpose-built KFC and Steers quick-service restaurants with drive-through lanes.

Ablution facilities:
Public sanitary facilities integrated into the development.

External works:
Access roads, parking, stormwater drainage and landscaping.

Area
Harare, Zimbabwe
Load More

Special features, conditions, challenges, achievements

Resolving a level difference with the service lane
The retail centre’s finished floor levels did not match the adjacent service lane, which posed both a structural and an aesthetic challenge. We built a cavity brickwork wall filled with cast in-situ concrete, so that it works as a retaining wall. This took up the level difference, kept the structure stable and preserved the specified finishes.

Cantilevered roof slab with concealed drainage
The cantilevered roof slab is a signature architectural feature, with rainwater downpipes concealed inside the supporting columns. The downpipes had to pass through the suspended slab at 1 m offsets, so they had to be positioned exactly before the concrete was cast. Detailed coordination and pre-pour checks made sure every downpipe was correctly placed. This kept the slab structurally sound and the architect’s design intact, with no rework needed.